Product Type: | PE Water-supply Pipes |
---|---|
Screw No.: | Single-screw |
Automation: | Automatic |
Computerized: | Computerized |
Certification: | CE, ISO9001:2008 |
Customized: | Customized |
Customization: |
---|
Suppliers with verified business licenses
Yatong PE Plastic Pipe Extrusion Production Making Machine
1- PLC control , high degree of automation
2- Adopting special screw and barrel , good effect
3- Adopting compound spiral engine head , effectively eliminate memory function of the material
4- Easy operate and need less worker
5- Convenient for maintance
Process :
PE material Hopper Dryer → PE pipe extruder → marking line extruder → mould → calibrator → vacuum calibration tank → spray cooling water tank → printer → haul-off → cutter → pipe discharging rack
Main Technical Data
Model | Pipe Diameter |
Vacuum Calibration Tank | Cooling tank | Haul-off | Cutter | ||||
Vacuum Pump (kw) |
Water Pump (kw) |
Length (mm) |
Water Pump (kw) |
Length (mm) |
Caterpillar | Motor (kw) |
Cutting Type | ||
GF-63 | 16-63 | 2.2*2 | 2.2*2 | 6000 | 3 | 6000 | 2 | 1.5*2 | |
GF-110 | 63-110 | 4*1 | 3*2 | 6000 | 3 | 6000 | 2 | 2.2*2 | |
GF-160 | 63-160 | 4*1 | 3*2 | 6000 | 4 | 6000 | 3 | 1.1*3 | Planetary Cutting/ Chamfering |
GF-250 | 63-250 | 4*2 | 5.5*2 | 6000 | 5.5 | 6000 | 4 | 1.1*4 | |
GF-450 | 110-450 | 5.5*1 7.5*1 |
7.5*2 | 6000 | 5.5 | 6000 | 6 | 1.1*6 | |
GF-630 | 315-630 | 7.5*2 | 7.5*2 | 10000 | 7.5 | 6000 | 6 | 1.1*6 | |
GF-800 | 355-800 | 5.5*2 7.5*2 |
5.5*2 7.5*2 |
1500 10500 |
5.5*2 | 6000 | 8 | 1.1*8 | |
GF-1200 | 630-1200 | 5.5*2 5.5*4 |
7.5*2 7.5*4 |
1500 10500 |
7.5*2 | 6000 | 10 | 1.1*10 |
PE Pipe Application :
•under pressure pipe
- water transportation and distribution
- gas distribution system
•discharge pipe
•protection lines for electric cable
- pipes with low friction inner sheathing
- 2 and 3-outlet pipe
1- The machine inspection before delivery in YATONG MACHINERY When you come to our factory .Check everything is it ok .
2- Free of charge of some necessary spare part.
3- One year guaranteeof all the machines running , if any problem ,we will bear. Of course if the machines after one year ,you also can ask for the technical guidance.
4- 1-2 technical engineers will be come to your factory to installation and commissioning the machines and train your workers if you need.
5- We accept 30% TT down payment, 70% TT or LC at sight before delivery.
6- Film packing or plywood packing suit for sea shipping.
Suppliers with verified business licenses